Tuesday,25th April 2017

Notification/Archives-2016

  1. Revised rate for testing of soil, concrete and steel conducted by the Testing Laboratory, Design Division, MePGCL, Umiam as on 6th Dec 2016.
  2. Information to Electricity Distribution Franchisee.
    Download related document.
  3. List of qualifying bidders for Secretarial Auditor.
  4. Notice related to Bill Payment.
  5. General Guidelines for Deposit Works.
  6. General Guidelines for preparation of estimate for Construction of Lines and Sub-StationSunder O & M, Scheme Works and Deposit Works.
  7. ROP-2010 & Medical Rules
  8. Guidelines for release of water through the gates of
  9. Notification related to Electrical Accident.
  10. Expression of Interest for conducting Secretarial Audit.
  11. Environmental Compliance report upto June 2016 (Half yearly Report) of Myntdu Leshka H.E. Project (3×42) MW.
  12. Revised rate for testing of soil, concrete and steel conducted by the Testing Laboratory, Design Division, MePGCL, Umiam.
  13. NOTICE : Revision of charges for online payment of electricity bills.
  14. Guidelines for Release of Excess Water
  15. 24 x 7 Power for all(PFA) state specific document. 

 

Site best viewed in Google Chrome 45 or above, Mozilla Firefox 41 or above, Opera 32 or above.