Existing Power Station

The following table depicts the existing Power Stations of the Meghalaya Power Generation Corporation Limited (MePGCL):

Sl. No

Station

Type

No of Units/ Capacity

COD

Capacity (MW)

1

Umiam Stage-I

Pondage

4 x 9 MW

FY 1966

36

2

Umiam Stage-II Extension of Stage I

2 x 10 MW

FY 1971

20

3

Umiam Stage-III ROR with pondage

2 x 30 MW

Unit 1: FY 1979
Unit 2: FY 1979

60

4

Umiam Stage-IV ROR with pondage

2 X 30 MW

FY 1993

60

5

Umtru Power Station

ROR with pondage

4 x 2.8 MW

Unit 1-3: FY 1958
Unit 4: FY 1969

11.2

6

Sonapani HEP ROR

1.5 MW

FY 2010

1.5

7

Leshka HEP ROR

3 x 42 MW

Unit 1& 2:FY 2013
Unit 3: FY 2014

126

8

New Umtru HEP ROR with pondage

2 x 20 MW

1st July 2017

40

9

Lakroh RoR

1 x 1.5 MW

Feb 2019

1.5

10

Leshka  ROR 

3×42 MW

Unit-I : 1st Feb.12 ;Unit-2 : 1st April.12; Unit 3- : 15th March

126

482.2