Recent Posts
- Additional Information (1): Petition filed by MePGCL for Truing up of Generation Business for the FY 2024-25 and Revised ARR for FY2026-27 for MePGCL and Determination of Tariff for FY 2026-27 of MePGCL
- Additional information (1) sought by Hon’ble Commission against the Petition filed by MePTCL for Truing up of Transmission Business for FY 2024-25 and Revised ARR for FY 2026-27 and determination of Tariff for FY 2026-27 for MePTCL
- Short Tender Notice: For the work “Construction of Civil & Hydro-Mechanical works of Riangdo Small Hydel Project (2×3 MW) in West Khasi Hills District, Meghalaya”
- Notice: Extension of bid submission date for the work “Design, Engineering, Supply, Erection, Installation & Commissioning of CO2 Gas Fire Suppression System for Umiam Stage-I and Stage-IV Power Station”
- Notice: Extension of bid submission date for the work “Design, Engineering, Supply, Erection, Installation & Commissioning of CO2 Gas Fire Suppression System for Umiam Stage-I and Stage-IV Power Station”

Recent Comments