Notice: Extension of bid submission date for the RFP for “Supply and installation of 3 Phase 500 KVA Distribution Transformer Test Bench and associated testing equipment’s for testing of Distribution Transformers up to 500 KVA at the Testing Laboratory, Transformer Repairing Workshop MePDCL, Sumer” by Editor_1 | Dec 8, 2025 | NewsLoading... Taking too long? Reload document | Open in new tab View | Download [207.60...
Notice: Extension of bid submission date for the work “Meghalaya Power Distribution Sector Improvement Project under Asian Development Bank (ADB) funding for Distribution System Improvement: 33 kV & 11 kV Line Distribution Development in Khasi Hills (East & West)” by Editor_1 | Dec 1, 2025 | NewsLoading... Taking too long? Reload document | Open in new tab View | Download [204.09...
Notice: Extension of “One Time Settlement (OTS) Scheme 2025-26” till 31st December 2025 by Editor_1 | Dec 1, 2025 | NewsLoading... Taking too long? Reload document | Open in new tab View | Download [381.25...
RFP for “Supply and installation of 3 Phase 500 KVA Distribution Transformer Test Bench and associated testing equipment’s for testing of Distribution Transformers up to 500 KVA at the Testing Laboratory, Transformer Repairing Workshop MePDCL, Sumer” by Editor_1 | Nov 28, 2025 | NewsLoading... Taking too long? Reload document | Open in new tab View | Download [218.10...
RDSS Annexure-II for the quarter year ended on 30th September 2025 by Editor_1 | Nov 26, 2025 | NewsView | Download [47.89...
Recent Comments